| |
|
|
|
St Ann's Villas
London , Phase II
Design Architect: Architeam.
Completed 2008. External refurbishment and extension of Grade II listed buildings, to include; stone, brick, render, windows, new roof coverings and complete redecorations. Internally, bathrooms include, stone wall & floor finishes, state of the art sanitary fittings and finishes throughout.
click photo for gallery |
|
|
|
Hillingdon Cycle Circuit
West London
Completed 2007. This "Green" newly designed centre has been short listed by RIBA for publication for it's conservation and climate change friendly design and build. The build included recycled & recyclable materials throughout. A Green roof and many features that provide wildlife with a safe haven. click photo for gallery |
|
 |
|
Atkins Farm
Prestwood, Buckinghamshire
Completed 2007. The design instruction entailed complete rebuild of two dilapidated barns, into high quality homes. The works entailed jacking up the English oak timber frames and forming new foundations, floor slabs & brick Cotswolds panels. We introduced new oak beams and cladding and both properties were finished sympathetically including brick, stone fireplaces and oak flooring.
click photo for gallery |
|
|
| <<back |
|